Yes, you can resume a job run that was previously stopped, but there are a few important conditions to keep in mind:
Plan Requirement:
The resume feature is only available to users subscribed to the Standard Plan or higher. The Standard Plan starts at $100, so if you're on a lower-tier plan, you will not have access to this functionality.
Time Limit:
You can only resume a stopped job run within 2 days (48 hours) of when the run was halted. After this time window has passed, the resume function will be disabled for the specific project, and you would need to start a new job run instead.
Why is this limited?
This time restriction is in place to manage system resources and ensure data consistency across long-running or paused processes. It also helps maintain the reliability of results when resuming interrupted jobs.
In summary:
If you're on the Standard Plan ($100/month or higher), and it has been less than 2 days since the run was stopped, you will see the option to resume the job directly in your project details page.